webnovel

Successful Trial Operation

Editor: EndlessFantasy Translation

"Circuit injection!"

"Heating experiment commencing…"

"Heating experiment successful!"

"The reactor pressure is 25 MPa. It has reached the predetermined parameter!"

Following that, Chen Chen watched these employees continue to perform their busy operations. Rows of data were constantly generated, becoming indicators for the generation of power.

After more than an hour of operation, the operating staff came over with pages on which dense lines of data were printed. "Report — experiments have shown no incidents of stack or unit tripping. The maximum shaft vibration of the steam turbine generator is 26.1 microns and the generator's rate of hydrogen leaking is 5.4Nm3/d. The meter input rate, protection input rate, and automatic input rate are all at 100%!"

The bald man took the papers and looked at them, then nodded to Chen Chen.

Chen Chen said, "In that case, get ready to commence the full-load trial operation."