The discharge of water from a dam was the process of releasing water from a reservoir or river by opening a water gate. It could be understood that the release of water from the discharge gate was a common water conservancy project measure used for flood control, drainage, and flow regulation. The specific operation method and flow control of the discharge gate would be adjusted according to the actual situation to achieve the best effect. For example, in flood control projects, the staff would lift the floodgates in time to reduce the pressure on the upstream water level according to the changes in the upstream water level and the downstream tide level. In addition, the discharge gate could also be used for flood storage, flushing sand, water intake, and other purposes. However, the search results did not provide detailed information about the discharge of water, such as the specific principle, operation steps, and effects of the discharge. Therefore, for a deeper understanding, it was recommended to consult more reliable information or professional opinions.
Shiduqing was a type of medicine that could improve adverse symptoms by expelling the dampness from the body. To be specific, Shiduqing capsules could help expel the dampness in the body, but the method of use and dosage needed to be carried out under the guidance of a doctor.
A discharge gate was a water conservancy structure used to discharge excess water or flood discharge from irrigation channels. He could understand some of the characteristics and functions of the vent. For example, the discharge gate was located at the end of the irrigation canal to discharge the accumulated water and facilitate the maintenance of the canal. In terms of flood control, the discharge gate could be used to discharge floods and reduce the flood pressure in the water collection area of the water system. At the same time, the discharge gate could also be used to regulate the flow of water from the upstream to ensure that the water flowed smoothly into the downstream river. According to different situations, the gates of the discharge gate could be fully opened or adjusted according to the actual water level. However, detailed information about the discharge ports, such as the number, location, and size of the discharge ports in different regions, required further investigation and research.
The word "Xing" should be pronounced as Xing. Flood discharge referred to the act of releasing and diverting water. It was a verb. According to the explanation in Modern Chinese, Xing was a verb. It was pronounced as Xing, the second tone. Therefore, the word "Xing" should be read as Xing.
There were two different descriptions of the first-class standard of the integrated sewage discharge standard. According to documents [4] and [9], the Level 1 standard refers to the water quality of the discharged sewage after treatment reaching Level A of the Level 1 standard. The water quality is required to be clear, transparent, colorless, odorless, free of suspended substances, odor, and impurities, and meet the hygiene standards for drinking water. According to document [2] and document [3], the first-level standard refers to the sewage discharged into the Class III water area of the national standard 3838 (except for the designated protected areas and swimming areas) and the sewage discharged into the Class II sea area of the national standard 3097. Due to the inconsistent descriptions in the search results provided, it was impossible to determine which description was the specific first-level standard.
In a particular instance, a patient with a complex heart problem was discharged successfully. This was due to a combination of advanced medical technology, a skilled medical staff, and the patient's own determination. The doctors were able to accurately diagnose and treat the issue, and the patient followed all the post - treatment instructions carefully.
In a manufacturing plant, there was a case of discharge upgrade. The waste water treatment system was initially only able to meet basic environmental standards. After some technological upgrades and process optimizations, the discharge of the waste water was upgraded to a much cleaner and more environmentally friendly level. It was a great success as it reduced the environmental impact significantly and also saved on potential future fines for non - compliance.
Well, there was this guy who had been in the hospital for a while. When he was finally being discharged, the nurse handed him his crutches. He was so excited that he started using them as pretend swords, dueling with the doctor and saying he was now 'free from the hospital dungeon'. It was hilarious to see the doctor play along for a bit.
Flood discharge gate referred to the time when the water level rose due to heavy rainfall upstream of the reservoir or dam, reaching or exceeding the warning line. In order to ensure the safety of the downstream city, the reservoir or dam would open the gate and discharge the flood through the flood discharge gate. This was a dispatch measure to prevent flooding or damage to the reservoir or dam to ensure the safety of the reservoir or dam. The purpose of flood discharge was to reduce the pressure on the reservoir or dam and protect the safety of the downstream area.