The standard for the preparation of the special construction plan for the deep foundation pitThe standards for the preparation of the special construction plan for the deep foundation pit are as follows:
1. ** Project summary **
- The basic information should describe the geographical location of the foundation pit in detail, including the surrounding traffic conditions, the distribution of buildings, etc., the purpose of the foundation pit (such as the foundation construction of buildings, underground structure engineering or water conservancy projects, etc.), and provide the scale information of the foundation pit (plane size, depth, etc.).
- The geological structure of the project site (stratum distribution, soil layer type, thickness, physical and mechanical properties, etc.) shall be described in detail, and the type of underground water, water level and its variation range, and water quality (whether corrosive, etc.) shall be analyzed.
2. ** In terms of the basis of preparation **
- In terms of laws and regulations, it was necessary to list the national and local laws and regulations related to the safety construction of construction projects and water conservancy projects (such as the Construction Law of the People's Republic of China and the Regulations on the Safety Production Management of Construction Project, etc.).
- In terms of standards and specifications, the relevant engineering construction standards and specifications (such as the "Building Foundation Pit Supporting Technique Code"(JGJ120 - 2012),"Water Conservancy and Hydro Engineering Construction Organization Design Code"(SL303 - 2017), etc.) were cited.
- The design documents included the design drawings and design instructions of the foundation pit.
3. ** Construction Plan **
- The construction progress plan shall present the time arrangement of each stage of foundation pit excavation in bar chart or network chart (such as excavation time nodes in layers and sections, interval time between layers, etc.), and consider the flexible time reserved for adverse weather and emergencies.
- The material and equipment plan shall calculate the quantity of required materials (such as steel, concrete, etc.) in detail according to the construction process and the project quantity, formulate the supply plan (purchase channel, mobilization time, etc.), and list the list of machinery and equipment required for construction (model, quantity, mobilization time, maintenance plan, etc.).
4. ** Construction technology **
- The excavation method of the foundation pit (layered, divided, basin type, etc.) and the reason for selection shall be explained. The slope or support form (such as soil nailing wall support, row pile support, etc.) shall be determined. The design parameters and construction points shall be described. The transportation route of the earth and the location of the spoil ground shall be described.
5. ** Safety assurance measures **
- For general safety measures, a safety management system (safety production responsibility system, safety education and training system, safety inspection system, etc.) shall be established and perfected. The safety responsibilities of each department and personnel shall be clarified. Clear safety warning signs shall be set up on the construction site, and necessary personal safety protection equipment shall be provided for the construction personnel.
- Special safety measures for the foundation pit should consider measures to prevent the collapse of the foundation pit (such as monitoring the supporting structure, monitoring the displacement of the pile top, the lateral displacement of the soil, the change of the underground water level, etc., and setting an early warning value. If the early warning value exceeds the early warning value, it should be reinforced in time).
6. ** Emergency Rescue Plan **
- In terms of emergency organization and responsibilities, an emergency rescue leading group should be established to clarify the responsibilities of the team leader, deputy team leader and each member.
- In terms of emergency rescue material reserves, a list of materials needed for emergency rescue (sandbags, rescue tools, first-aid medicines, etc.) should be listed, and the storage location and safekeeping personnel should be specified.
- In terms of Incident Response Service procedures, develop detailed Incident Response Service procedures (accident reporting procedures, on-site emergency response measures, etc.).
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
The Noun Form of Person"Person" itself was a formal form, meaning "person, body". When it refers to "people", it can refer to men or women, emphasizing a single person; when it is modified by numbers, it can also refer to many people (equivalent to people); when it refers to "body", it refers to the torso and appearance of a person, equivalent to the body. The derived term was personality.
"Choose" was equally exciting. Everyone was welcome to read it!
Light attribute soul beastThere were some light-attributed soul beasts in Douluo Continent, such as the Radiant Holy Dragon. It was the light-attributed giant dragon that was the closest to the bloodline of the Radiant Dragon King among the Dragon God's Nine Sons. Its entire body emitted a golden light and had pure white dragon scales. There was also a faint holy aura in the light. Its martial soul was owned by the Mun Kingdom, Bebe Kingdom, Long Yeyue Kingdom, En Ci Kingdom, and the others. The Three-eyed Golden Lion also possessed the ultimate attributes of fire and light. It also mastered pure spirit-type and strength-type. It was a top-tier soul beast with a noble bloodline.