The second phase of Jinxiu Yunlu would be handed over on September 30th, 2024. Currently, the interior was being renovated, and the second phase of the greenery was more than half completed. If you want to know more about the follow-up, click on the link and read it!
The latest news from Jinxiu Yunlu was that the Jinxiu Yunlu project opened on December 19,2021, and the latest price was about 24400 yuan/square meter. The total area of the project is about 60,087.81 square meters, and the total construction area is 205,774.37 square meters. Most of the buildings were high-rise, and the property types were ordinary residential and commercial. The total number of households was 1444, and the renovation was complete. The parking ratio was 1:1.15, and the handover date was October 31, 2023. In addition, the latest news showed that the Jinxiu Yunlu project had added Building 10, with a total of 173 suites, with a floor area of 76, 89, and 110 square meters, with an average price of 26018 yuan/square meter. At present, the project was being resumed and was expected to be delivered on time.
Jinxiu Yunlu was located at the intersection of Ningwu Road and Lexin Road in Yuhuatai District (about 900 meters south of Wuyue Square), belonging to the business district in the south of the city. The reference average price is about 25000 yuan/square meter- 26376 yuan/square meter. Most of the building types are high-rise buildings, and the property types include residential and commercial. The total number of households was 1444 units, which were fully renovated and delivered. The building was equipped with 1658 parking spaces, with a parking ratio of 1:1.15. At present, the main promotion is 89 - 110 square meters of apartment type, with a variety of apartment type advantages, such as excellent double hall, comfortable master bedroom and so on. There were many commercial places such as Wuyue Square, many financial institutions, medical stations, drugstores, etc., and many cultural squares and parks nearby. The overall travel and supporting facilities were very convenient. If you want to know more about the follow-up, click on the link and read it!
Green City·Yongxi Yunlu is the representative work of Green City Lake Mountain in 2024, with a building area of about 200 - 270 square meters. The project is located in the core of the Main City of Shushan in Hefei. It is connected to the High-tech Zone in the west and the government business service area in the south. The transportation is convenient. It is about 800 meters away from the Dashushan Station of the subway line 2, which can reach many areas. It was surrounded by greenery and many parks. On one side was the memory of Luzhou, and on the other side was the prosperity of the city. It had excellent residential value and rare value. The project had a low plot ratio of about 1.1, which was rare in downtown Hefei in the past six years. It was surrounded by water on three sides and green on all sides. The original terrace design, the plot of land as a whole was raised to create a terrace villa for enjoyment. The low density and sparse building spacing outlined the poetic scenery of the four seasons. The landscape design draws on the landscape design logic of Nanjing Zhanyuan to create a secluded and quiet environment. After more than four months of fine polishing from taking the land to real-life fulfillment, the living demonstration area of Wanfang Lake and Mountain has been revealed. It has absorbed the garden construction concept of "Garden and Craftsmanship", combined with the height difference of terrain to integrate buildings, nature and courtyards, and created eight views of water garden with six techniques of building houses. The project left the precious lake scenery resources to the residents, creating a "fan pavilion" and eliminating the spatial barrier with a 360° ultra-white glass screen. They had also built a multi-functional Hushan Haute Couture Club in sync with the global high-end luxury houses. The spatial lines were built with the meaning of "walking the landscape painting axis". There was a swimming pool life complex (a heated swimming pool on the first floor, a gym on the second floor, a yoga room, etc.), and a private banquet hall with various functions. At the same time, innovative designs were designed around "her aesthetics", such as the Queen's Space with anti-aging oxygen equipment and the outdoor space with a lake-overlooking bubble pool. The building was innovative with the Ritz-Carlton Hotel in Kyoto as the benchmark. The north facade of the building presented the exquisiteness and beauty of the south facade. The novel "Listening to the Rain in Green Bamboo and Watching the Egrets" is equally wonderful. Everyone is welcome to click and read it!
I didn't get the latest news about the third phase of Tiangong Villa. Sorry, I can't give you an accurate answer. If you want to know more about the follow-up, click on the link and read it!
The latest news from Beijing Yard Phase II was that the project had officially resumed on March 20. According to the plan, it was estimated that the roof of the building would begin in July and the roof of all the stacked villas would be completed by the end of November. The project was planned to be completed by the end of next year. This was one of the important projects that Taihe Group welcomed in Beijing.
The third phase of the Galaxy Prosperous Jin City was about to open. At present, the second phase of Galaxy Shengshi Jincheng and some of the first phase's leftover goods were sold at a price of 27000 yuan/m2. The third phase might be priced based on the surrounding supporting resources. It was surrounded by rich supporting resources, dense educational resources, and famous schools; commercial facilities were complete, from large shopping centers to community convenience stores; subway stations and bus lines leading to important transportation hub were abundant. The entrance of the 128-square-foot apartment could be used as a tea room. The living room and dining room were in direct circulation. There was an 80-centimeter bay window. The room was large and made use of the bay window space. The public bathroom was separated by three sections of dry and wet. Some rooms had a 270-degree bay window and 30 centimeters of it was knocked off when it was delivered to make the floor space larger. In addition to 126 square meters and 98 square meters, there were other areas to choose from. There were 50,000 square meters of Lingnan Fengqing Street around the project.
The latest news for the second phase of the Huaihe River waterway project was that the project had received an overall feasibility study approval, and the estimated total investment was 43.8 billion yuan. The construction of the project would improve the flood control standards of Hongze Lake, reduce the pressure of flood control and waterlogging removal in the Huaihe River, and create conditions for the construction of the Huaihe River's sea channel. It was of great significance to ensure the high-quality economic and social development of the basin. In addition, the construction land for the project had been approved by the State Council and the Ministry of Natural Resources, providing a guarantee for the construction of the whole line. However, the search results did not provide specific information on the latest progress or the start date of the second phase of the Huai River waterway project.
The second phase of Huayu Jinxiu Xi'an Community had a 32-mu kindergarten. "Prosperous Brocade Record" is equally exciting. Everyone is welcome to click and read it!
"The delivery date of the second phase of the contract is May 30, 2024. The delivery has been delayed. Due to the obstruction of the power construction, the project could not be constructed. At present, the alternative power construction plan was in progress. The novel " The Unorthodox Great Ming " is equally exciting. Everyone is welcome to click and read it! "
The latest news from the coastal section of the second phase of the Huaihe River waterway project was that the construction of the Zhangjiahe Gate Station project had started in July 2022. It was expected that the housing construction and auxiliary projects would be completed by the end of November and completed by the end of the year. The project was one of the pilot projects of the second phase of the Huai River waterway project. It was located in Binhai County and was part of the widening and deep excavation of the river. It also included the construction of water conservancy projects along the route. The goal of the project was to improve the drainage capacity of Binhai County and ensure the economic and social development of the county as well as the safety of people's lives and property. The specific progress of the project and construction details could be referred to relevant reports and official news.