webnovel

I Become An NPC That Can Do Infinite Job Changes

When Su Mu woke up, he realized he had been transmigrated to a game and became the lowest-ranked NPC, a farmer. In a world of endless war, Su Mu would not be able to protect himself as a farmer. However, he suddenly came to realize that he could change his job as many times as he wanted. In his first job change, he became a Militia and gained the ability to fight. In his second job change, he became an Archer and gained the ability to make long-ranged attacks. In his third job change, he became a Lancer and gained the ability to pierce armors. In his fourth job change, he became a Heavy-armored Knight and gained the ability to switch between defense and attack with ease. In his fifth job change, he became a Holy Knight and gained the power of Holy magic. Su Mu completed countless job changes and managed to gain infinite power. When the game and the real world merged, Su Mu was already the renowned Dragon Rider that had conquered lands and built the strongest kingdom to have ever existed.

Pumpkin Mine · Jogos
Classificações insuficientes
40 Chs

Chapter 8: Luck Bursting! Job Change Order

Translator: Dragon Boat Translation Editor: Dragon Boat Translation

Sensing this, the Silver Moon Wolf King's eyes immediately revealed a trace of panic.

When Su Mu noticed it, he remained unmoved. He didn't even inch closer to attack.

Wolves were originally cunning, and the Silver Moon Wolf King was even more so.

If Su Mu chose to move closer during this time, he would definitely be killed by the Silver Moon Wolf King's last counterattack.

Others might not know what the Silver Moon Wolf King was capable of, but Su Mu did.

Following a short stalemate, as the wolf blood poured out, the Silver Moon Wolf King, which was getting weaker and weaker, finally couldn't hold it in any longer. It opened its mouth towards Su Mu.

"It's coming!" Su Mu's eyes focused, and his right foot began to accumulate power.

Just as the Silver Moon Wolf King's mouth lit up with a silver ball of light, Su Mu's right foot stomped hard on the ground.

With a bang, fractures appeared on the ground.

At the same time, Su Mu left behind a series of afterimages and disappeared in a flash.

This was an instant acceleration technique that Su Mu had mastered in his previous life. It was also the reason why Su Mu dared to challenge the Silver Moon Wolf King alone.

At this moment, a group of wind blades that were 10 meters wide flew over with a whoosh.

Dozens of wind blades that were 1 meter long plowed through the spot where Su Mu had been just now in the blink of an eye. There were endless cracks everywhere.

"Damn, this Silver Moon Wolf King is really fierce. It can condense so many wind blades even after being heavily injured..."

"However, let's end it like this!"

Thinking of this, Su Mu moved his feet and arrived in front of the Silver Moon Wolf King in a breath. He raised his knife and stabbed out.

"Puchi!" The familiar sound rang out. This time, the long knife plunged into the Silver Moon Wolf King's neck effortlessly.

Then, Su Mu hurriedly left.

The Silver Moon Wolf King turned its head and attempted to bite. Unfortunately, it missed its target.

The Silver Moon Wolf King, which had been weakened after releasing its ultimate move, finally panicked completely.

Su Mu was faster than it, and he was even capable of attacking and injuring it.

Most importantly, after Su Mu injured it, its wounds couldn't heal at all.

If this continued, it would definitely die.

After glancing at Su Mu with a fierce expression, the Silver Moon Wolf King leaped up and rushed towards the entrance of the valley.

"Ci Ci Ci Ci Ci..."

As the Silver Moon Wolf King ran, more blood spurted out from its wounds.

Su Mu saw this and sneered, "You still want to run? Dream on!"

After making the remark, Su Mu moved his feet and chased after the Silver Moon Wolf King right away. He raised his hand and slashed.

"Awu~~~~"

An agonizing howl immediately came out from the Silver Moon Wolf King's mouth. It caused the surrounding vegetation and leaves to sway vigorously, making rustling sounds.

Su Mu's knife hit the Silver Moon Wolf King's vital point.

It was precisely due to this knife that the Silver Moon Wolf King was forced to stop howling. Not only this, but it was also unable to launch a counterattack against Su Mu.

Su Mu did not care whether the Silver Moon Wolf King howled or not. Taking advantage of its injury to take its life was the best choice.

Therefore, Su Mu did not hesitate to raise his knife and continue stabbing.

"Puchi, Puchi, Puchi..."

One stab after another, the knife struck its vital point.

After a few breaths, the Silver Moon Wolf King finally met its death with an unwilling howl.

[Your Basic Blade Skills has advanced to Level 9!]

[You have killed 24 gray wolves. Obtained 1,200 experience points!]

[You have leveled up to Level 10. You have met the requirements to become an official 'Soldier'!]

[You have killed the Silver Moon Wolf King. Special reward of attribute points x10!]

The moment the system notification rang off, Su Mu was stunned.

"Attribute points... I can freely choose to add a certain attribute. This reward is heaven-defying!"

In his previous life, Su Mu knew that increasing attributes was a very difficult thing to do, especially in the later stages. He did not expect to be so lucky to encounter an injured Silver Moon Wolf King and obtain 10 attribute points.

Otherwise, Su Mu would not be so surprised.

"If the players knew about this, I wonder if they would be so jealous that their eyes would turn red..."

Thinking of this, Su Mu could not help but smile.

When his 'Basic Blade Skills' was upgraded to Level 9, Su Mu's mind once again had some insights on how to use a blade. Even the attack power of a knife-type weapon had increased from 1% to 9%.

Not only that!

Every time the skill was upgraded, he could feel his body growing stronger.

According to the growth rate, as long as he raised the level of the 'Basic Blade Skills' to perfection, he would be able to obtain a nearly 10% increase in strength! In other words, his combat power will receive +1!

There seemed to be no difference between a 10-point combat power and an 11-point combat power.

If he were to encounter dozens or hundreds of enemies at every turn, he would still be killed in mere seconds.

However, for Su Mu, this was a good start.

A Level 10 'Basic Blade Skills' could give him an additional point in strength, but what about a Level 10 'Intermediate Blade Skills'? What about a Level 10 'Elite Blade Skills'? Even as he was upgrading his blade skills, he could also obtain other skills through Avril to enhance them.

When the number of skills he had mastered was ample enough and the level of his skills was high enough….

Even if it was just a 'Soldier' NPC, he could still kill a higher-level professional 'Hero'!

At this moment, the sound of something going off could be heard.

A shining treasure chest suddenly dropped from behind the Silver Moon Wolf King's corpse.

Su Mu looked over, and his eyes suddenly lit up.

"F*ck! No wonder the Silver Moon Wolf King chose this valley as its nest. As it turned out, there's a treasure chest here!"

Treasure chests were unique treasure items in this world. Only Lords and Heroes with territory markings could see and open them. Ordinary people could not see them.

Su Mu was appointed as the Captain of Chang'an Village by Avril. Naturally, he was a Hero with territory markings, so he could sense it.

He took two steps forward and opened the treasure chest, looking at the items inside.

There was a large black knife, a fish scale armor, and a long sword without a scabbard but with a red gem on the hilt. In addition, there was also a ring, a token, and a book.

These were either blue, purple, or five-colored. One could tell at a glance that they were extraordinary.

"Two pieces of advanced equipment, one purple skill book, two pieces of rare equipment, and..."

Thinking of this, Su Mu picked up the token that was emitting five-colored light.

"This is... a Knight Job Change Order!"

Su Mu was stunned.