webnovel

Repair Completed!

編集者: Atlas Studios

Ding!

"Construction [External City Wall] repaired by 0.1%. Progress: 98.47%."

"Construction [Dragon's Clock Tower] has been repaired."

"Construction [Alchemy Workshop] has been repaired."

"Construction [Giant Fountain] has been repaired."

"Construction [Dragon Statue] has been repaired."

"Construction [Internal City Wall] has been completed."

"..."

Soon, the second night arrived. After two days of construction, the restoration of the entire Cold Desolate Dragon City was almost completed. Most of the buildings in the city were revived.

As long as the damage was not more than 30%, there was a possibility of repair.

The buildings that were more than 50% damaged were all cleaned up. Even the remaining buildings were removed.

As a result, in this huge city that occupied more than 40,000 hectares, apart from the sparse huge buildings, most areas were very empty. The entire building also gave off a grand feeling.