Due to a shortage of building materials, all materials produced are currently being allocated to the construction of the main base. The sub-base at the Meteorological Station is expected to be established only after 72 hours.
Meanwhile, a significant issue arose at the Shadow base after they connected the power supply. With only 24 hours into sawmill operations, the Threat Value had already exceeded 5 stars. Even with double sentries and sound insulation technology, they couldn't suppress the noise generated during the sawing process.
"There's no such thing as a free lunch," Stone decisively halted the sawing, hoping to obtain building materials through scavenging. Alternatively, they could wait to resume sawing after the city defense battle, which meant the Meteorological Station sub-base plan had to be further delayed.