I decided to do my best to make this project work.
Although I had promised Seth that I would schedule my time reasonably and have a good rest.
Early the next morning, I got up at 5 a.m. and arrived at the construction site before 6 a.m.
Before all the workers could arrive, I checked all the materials and checked both the inside and outside of the construction site. Only after that was I relieved.
The whole project lasted for two and a half months.
During this period, I didn't rest once.
In summer, there was no air conditioner or fan in the studio. As I endured the heat in the studio day by day, I almost had heatstroke several times, making a herbal liquid for heat prevention an essential item in my bag.
Finally, the day of handing over the project came.
That day, Patrick, Caroline, Angie, me, Seth, and every one of the Engineering Department were all on the scene.