287 Building a Soap Plant

Translator: Transn Editor: Meh

Border Town, Western Region.

The washing stones bought from Silver City had filled four ships, and it took a few days to unload them.

Now that there were sufficient raw materials, the soap production plan was formally put on the schedule.

The workshop and warehouse had been set up already to support the soap factory, which was located beside the industrial park next to the second steam assembly, which was the same shape as the soap factory. In addition to the wood cutting and hoisting being the responsibility of the witches, the roof, beams, and walls were a wooden structure that was smaller than the second steam assembly; therefore, the whole building project period was only a week.

logologo

This is the end of Part One, and download Webnovel app to continue:

DOWNLOAD NOW
avataravatar
Next chapter