The wasteland did not have the conditions required to provide a physical test environment for Hope One. Regarding the system's debugging testing, Su Mo chose the extremely cautious triple test.
Cutting out all the entertainment systems and only installing an autopilot system, with the current computer's configuration, in the continuous load testing, even if the load percentage often went above 60%, overall, the performance line still presented a healthy arc on the graph.
Compared with this arc, the concurrency testing arc on the other side was also not too bad. During the enemy encounter simulation, Hope One could make timely course adjustments to avoid obstacles.
As for the most important simulation for the number of extreme steering errors, it remained at a steady "0".
After he recorded all the simulation data changes in his notebook, Su Mo immediately stopped waiting and turned off the power, dismantling the entire computer.