The composition and compilation of the bill of quantitiesAccording to the Code for the Calculation of Bill of Volume of Construction Engineering, the bill of quantities consists of the following contents:
1. On the cover.
2. Guidance Notes.
3. The general explanation.
4. Bill of quantities of sub-projects.
5. List of measures.
6. List of other projects.
7. A list of sporadic work items.
8. List of fees and taxes.
The bill of quantities is an integral part of the bidding documents. It should be prepared by the bidder with the ability to prepare it or the project cost consultant with corresponding qualifications entrusted by the bidder. When preparing the bill of quantities, it should be prepared in accordance with the bidding documents, construction design drawings, construction site conditions, and various specifications and standards. In addition, they should be familiar with the content of the specifications to ensure that there are no overlapping or missing items; accurately describe it to avoid misunderstanding and bidding errors caused by unclear descriptions; master the compilation principles to ensure the accuracy and completeness of the compilation. When the tender is conducted by the bill of quantities, the bidder shall be responsible for its accuracy and completeness. The list of sub-item projects is a closed list that cannot be adjusted. During the bidding stage, bidders are not allowed to make any changes to the contents listed in the list. If they think that the contents of the list are inappropriate or omitted, they can only be uniformly modified and corrected by the list editor through questioning. The list editor shall send the revised list of quantities to all bidders.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
The Wukong series is on sale in limited quantitiesBlack Myth: Wukong had many limited edition products:
- Its physical collection was limited to 10,000 sets. The original price was 1998 yuan, but the second-hand price had soared to 9999 yuan.
- The limited edition graphics card of the Wanli GeForce RTH 4070 Super Ox "Black Myth: Goku" was limited to 500 cards and sold for 4949 yuan.
- Feizhi Octopus 4 "Black Mythology: Wukong" limited edition controller, tens of thousands of limited edition sets were sold out on the day of the new product launch.
- Black Myth: Wukong's limited edition had a total of 30,000 sets of Black Wukong's customized stamps in gift boxes, and they were sold out early.
At which stage was the bill of quantities prepared?The preparation of the bill of quantities was mainly in the project bidding stage. After the completion of the project plan, preliminary design and part of the construction drawing design, the bidding unit can entrust the preparation unit of the tender price to calculate and list the bill of quantities of each sub-project according to the unified calculation rules of the bill of quantities, which will be sent to each bidding unit as an integral part of the bidding documents. The thickness and accuracy of the bill of quantities depended on the depth of the design of the project, as well as the technical level and experience of the compilation personnel. The preparation of the bill of quantities can be divided into two stages: one is the preparation of the format of the bill of quantities, and the other is the preparation of the bidding cost using the bill of quantities. The bill of quantities shall be prepared by the tenderers who have the ability to prepare it or the project cost consultant who is entrusted by the tenderers and has corresponding qualifications. The tender shall be conducted by means of the bill of quantities. The bill of quantities must be an integral part of the tender documents, and the bidder shall be responsible for its accuracy and completeness.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
How to write the summary of the bill of quantitiesThe summary of the preparation of the bill of quantities can include the following points:
** 1. Concept and background related **
1. ** Concept Description **
- The bill of quantities was a list of all the projects and contents that the employer would be prepared to implement. According to the unified calculation rules of the quantities, according to the location and nature of the project, the physical quantities and technical methods were listed in a unified unit of measurement. It was an important part of the bidding documents.
2. ** Backstory **
- With China's entry into the World Trade Organization, the construction cost management was impacted by the construction price formation system, and it was integrated into the global unified market from the state of large differences in various regions in China. The construction cost pricing method was changed from the bidder's self-compiled bill of quantities to the bidder's bill of quantities. This not only complied with the international competitive bidding method, but also solved the contradiction between "government management and market competition mechanism".
** II. Key Elements of Establishment **
1. ** Items **
- He had to make sure that he didn't miss anything. The project content determines the scope of work of the list, and may be inconsistent with the project content of the quota sub-item. If you are not familiar with it, it is easy to cause repeated or missing items. Sometimes, lists can be combined or split according to the situation of the project. Using existing results (such as lists of similar projects) can be faster and less likely to miss items. After the items were listed, they had to be checked to correspond to the drawings. If there were any missing items, they had to check the list and make up for it. They also had to summarize the missing items and form a check list.
2. ** Description *
- If Party A is not clear about it, the relevant information and reports can be submitted and written in the project characteristics; when referring to the standard drawings, the drawing number and detailed content should be clearly written; if the drawings have corresponding methods, the source of the drawings should be stated in the characteristics of the list; for the water supply and drainage list of the installation profession, the title can be listed to describe the commonness first, and then the differences can be listed separately.
3. ** Calculation of quantities **
- Two batches of people could be used to increase the accuracy. For example, double counting (cross-check the main quantities after division of labor and cooperation, and check in detail if there are any differences), index check (check the results by using the logical relationship between quantities and index range); for projects with incomplete drawings, Party A can be suggested to implement the tentative quantities method, evaluate the comprehensive unit price during bidding, and re-calculate the quantities after winning the bid to sign the final contract.
** 3. Quality requirements **
1. ** Follow the establishment principle **
- It shall be compiled according to the bidding documents, construction design drawings, construction site conditions, various operation specifications, standards and relevant specifications, and shall follow the principle of "Four Unifications".
2. ** Avoiding problems **
- Be familiar with the relevant specifications to avoid overlapping and missing items, because this will increase the risk of the bidder's project volume. It was a typical problem to accurately describe the characteristics. If the characteristics were not clearly described, it would cause differences in understanding, lead to errors in the bidding company's pricing, affect the quality of the bidding work, and may also bury hidden disputes and claims. Carefully and meticulously calculate the quantities and check the bill of quantities, including whether the items in the list are repeated or missing, whether the description of the project characteristics is clear, and whether the calculation of quantities is wrong.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
Buying large quantities of jade scrapsIf you want to buy a large amount of jade scraps, you can try the following methods:
1. ** Online Channel **:
- If you searched on some jade trading e-commerce platforms, there might be merchants selling jade scraps, but you had to pay attention to the reputation of the merchants and the quality of the products. You were required to provide relevant identification certificates.
- Use a search engine to find merchants or suppliers who specialize in the wholesale of jade scraps, and then contact them to understand the specifications, prices, quantities, and other information of the products.
2. ** offline channels **:
- Contact the jade processing workshop or factory. These places will produce a lot of scraps during the process of processing the raw jade, and they may be willing to sell the excess scraps.
- There were often many merchants or individuals who were involved in jadeite related businesses around the Kuangqu. They might have jadeite scraps for sale. For example, if 220,000 people bought Yemuxi (related to jadeite raw stones) in the Kuangqu, there would be more jadeite related resources circulating around the area.
- Attending an exhibition or auction in the jade industry, you might encounter merchants selling jade scraps on these occasions, and you could directly check the quality of the scraps.
When purchasing, they had to consider the texture, color, clarity, cracks, and other factors of the leftover materials according to their own needs to ensure that the purchased jade scraps could meet their own needs.
The novel "Ledge" is equally exciting. Everyone is welcome to click and read it!
The content and key points of the bill of quantitiesThe preparation of the bill of quantities mainly includes the following aspects:
1. ** Constitution **: As a part of the bidding document, it mainly consists of the list of sub-projects, the list of measures, the list of other projects, and the list of fees and value-added taxes. The result document prepared by the project manager should cover the cover of the bill of quantities, general description, summary sheet of engineering projects, summary sheet of individual projects, summary sheet of unit projects, summary sheet of sub-projects, list of measures, list of other projects, list of fees and value-added tax projects, etc.
2. ** Preparing basis **: Including the pricing basis and methods issued by the national, provincial, and industrial construction authorities, including the valuation specifications of the bill of quantities of construction projects, the implementation rules and aptitudes of relevant specifications, construction design drawings and their descriptions, design modifications, change notices, and other technical materials, as well as relevant design and construction specifications and standards.
The key points of the preparation of the bill of quantities are as follows:
1. ** Items **
- To ensure that there are no missing items, it is necessary to be familiar with the project content of the list to avoid repeated or missing items due to the difference in the project content of the quota sub-item.
- The lists could be combined and split according to the project situation to facilitate settlement.
- Make full use of existing achievements, select and modify from the list of similar projects to reduce the risk of missing items.
- Check the corresponding situation of the listed items and the drawings. If you find any missing items, check the list and make up for it. At the same time, summarize and record each missing item.
2. ** Description *
- To accurately describe, in the case that Party A is not clear, the relevant information and reports can be submitted and written in the project characteristics; when referring to the standard atlas, the atlas number and detailed content should be clearly written; if the drawings have methods, the source of the drawings for the methods in the list characteristics should be stated.
- For the water supply and drainage lists of installation specialties and other lists with commonality, the title can be used to describe the commonality first, and then the differences can be listed separately to make the description intuitive and clear.
3. ** Calculation of quantities **
- Two batches of people can be used to calculate the quantity to improve the accuracy, such as large number calculation (cross-checking the main quantities after the calculation), index check (using the logical relationship between the quantities to check the results).
- For projects with insufficient drawings, it is suggested that Party A implement the method of tentative engineering quantity. First, the comprehensive unit price will be given priority. After winning the bid, the engineering quantity will be re-calculated and the final contract will be signed.
4. ** Other Important Points **
- It must be compiled in accordance with the principle of "four unifications".
- After the compilation is completed, in addition to the repeated verification by the compilation person, it also needs to be reviewed by others. The review content includes whether there are duplicate items, missing items, whether the description of the project characteristics is clear, and whether there are errors in the calculation of the quantities.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
Five Elements of Preparing the Bill of quantitiesThe sub-item bill of quantities must be prepared according to five elements, namely, the code, name, characteristics, unit of measurement and calculation rules of the project.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
How to prepare the bill of quantities for the showcaseThe preparation of the bill of quantities for the showcase could be done from the following aspects:
1. ** List Items **
- ** Make sure no items are left out **: The project content determines the scope of work of the list items. Pay attention to the possible differences between the project content of the quota sub-item and avoid repeating or missing items. You can list them according to the specific components of the showcase, such as the cabinet structure, cabinet door, partition, decorative parts, etc. At the same time, the list should be merged or split according to the project situation for settlement. For example, if the different parts of the showcase were similar in terms of construction techniques and materials, they could be considered as a list; if there were special requirements or large differences, they could be listed separately.
- ** Make full use of existing achievements **: If there is a list of similar showcase projects, you can choose and modify them on this basis. This way, not only will it be faster, but it will also be less likely to miss items. After completing the list, check it against the design drawings of the showcase. Check the covered entities on the drawings. If you find any missing items, check the list and make up for it. Every time there is a missing item, it should be summarized in time and put into the easily missed item inspection list.
2. ** List Description **
- ** Details and accuracy **: If Party A is not clear about certain requirements of the showcase, you can submit the relevant information and report and write it in the project characteristics. If you refer to the standard atlases, you must clearly write down the number of the atlases that you refer to, and list the details of the atlases to facilitate later verification and settlement. If there was a corresponding method of displaying the cabinet on the drawing, the source of the drawing should be stated in the characteristics of the list.
3. ** Calculation of Work Volume **
- ** Accuracy guaranteed **: You can use two batches of people to calculate the quantity to improve the accuracy. After the completion of the calculation, the calculation of the large number shall be repeated, that is, the personnel who divide the work and cooperate shall cross-check the main quantities. When there are many differences, they shall be checked in detail. The indicator shall be used to check whether there is any deviation in the result according to the logical relationship between the quantities and the index range. If it exceeds the range, it shall be checked carefully. For the showcase project, if the drawings are not in place, it can be suggested that Party A implement the tentative work volume method. The bidding will be based on the comprehensive unit price. After winning the bid, the work volume will be re-calculated and the final contract will be signed (applicable to similar projects and the list description is basically no problem).
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
Prepare the bill of quantities for cement road worksThe following are the general steps and contents of preparing the bill of quantities for cement roads:
** I. Project Introduction **
1. ** Basic Road Information **
- The length, width, thickness, and other size information of the cement road should be clear. For example, the new cement road should be 88 meters long, 3 meters wide, 0.18 meters thick, and 0.15 meters thick at the bottom.
2. ** Road location related **
- Mark where the road is located. If the part is a hardened road, you can mention the specific location or the range of the road section.
** II. Bill of quantities and description **
#(I) Leveling and Rolling Subgrade
1. ** Project features **
- The location was clearly a hardened road.
- Give a description of the scope, for example, see the design drawings.
- The specified degree of compression, if the degree of compression is greater than or equal to 0.93.
- Remind the bidder to investigate the site to determine the excavation, refill, and disposal of the remaining earth and stone. At the same time, it must meet the requirements of the local environmental management department for environmental protection and all factors such as waste soil fee and soil resource fee. See the design drawings for other details.
2. ** Unit of measurement and quantities **
- The unit of measurement is square meters (m <2>), and the amount of work is determined according to the actual area of the road.
#(II) Mountain skin stone cushion
1. ** Project features **
- It was located at the base of the hardened road.
- The specifications and names of the stone materials should be specified, such as the use of mountain skin stone.
- Please indicate the thickness, such as 15cm. For other details, please refer to the design drawings.
2. ** Unit of measurement and quantities **
- The unit of measurement is square meters (m2), and the engineering quantity is calculated according to the area of cushion laying.
#(3) cement concrete pavement
1. ** Project features **
- The part was the hardened road surface.
- Confirm the concrete strength grade, such as C30.
- List the adventuring materials, such as water, sand, cement, stones, and adventuring agents.
- Give the thickness, for example, 18cm.
- Explain the setting of the expansion joint. For example, an expansion joint shall be set every 4 - 6 meters. The expansion joint shall be filled with asphalt hemp thread and sealed with asphalt caulking ointment.
- It included the work content of template manufacturing and installation, engraving, maintenance, etc. For other details, see the design drawings and other materials.
2. ** Unit of measurement and quantities **
- The unit of measurement is square meters (m <2>), and the engineering quantity is calculated according to the road surface area.
#(IV) Earthen the shoulder
1. ** Project features **
- The location was the hardened road.
- Confirm the thickness of the compression, for example, 20cm.
- Explain the type of soil, such as comprehensive soil.
- The specified factor of compression, for example, the factor of compression is not less than 0.9.
- Including the earth resource fee, see the design drawings for details.
2. ** Unit of measurement and quantities **
- The unit of measurement is cubic meters (m cubic meter), and the engineering quantity is calculated according to the volume of the shoulder soil.
#(5) Culvert (if any)
1. ** Project features **
- For example, the description of the specific specifications of the drainage pipe with a diameter of 400.
2. ** Unit of measurement and quantities **
- According to the quantity and specifications of the culverts, determine the appropriate measurement unit (such as meters) and the amount of work.
** 3. Calculating the Combined Unit Price and Total Price **
1. ** Consolidated unit price confirmed **
- According to market conditions and project quota,(such as the relevant quota of the Ministry of Transport), labor unit price (such as 77.05 yuan/man-day according to local regulations), material unit price (the base price of main materials refers to the information released by the local traffic construction project cost management station, the price of gasoline and diesel refers to the price released by the Price Bureau, and the rest of the prices are determined according to market research), machine unit price (calculated according to the relevant quota, vehicle and vessel tax is calculated according to local standards, excluding road maintenance fees), etc. to determine the comprehensive unit price of each project.
2. ** Total Price **
- The total price is equal to the engineering quantity multiplied by the comprehensive unit price.
** IV. Other expenses (such as general expenses, etc.)**
1. ** Chapter 100: General Rules **
- Including construction safety, temporary facilities fees (if there is a separate sub-item in Chapter 100), work-related injury insurance fees (if there is a separate sub-item in Chapter 100) and other related expenses, such as 3188861 yuan.
2. ** Reserve (if any)**
- It is usually calculated according to a certain proportion of the total cost of chapters 100 - 900, such as 10% of the reserve fund, etc.
When preparing the bill of quantities of cement road works, it should be based on the approved preliminary design budget estimate and construction drawing budget. In principle, it should not exceed the preliminary design budget estimate, and strictly follow the relevant local and national preparation methods, regulations, notices and other requirements.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
What is the procedure for preparing the budget for the bill of quantities?The process of preparing the budget for the bill of quantities can be divided into the following steps:
1. ** Project preparation **: Before the preparation of the bill of quantities budget, the preliminary preparation work of the project must be completed, including the project feasibility study, project planning and design, and the formulation of the construction plan. After these works are completed, the follow-up preparation work can be carried out.
2. ** Establishment basis **: The preparation of the bill of quantities must have a clear basis, such as the design drawings, technical specifications, contract conditions, etc. The technical specifications specify the types, specifications, quantity and other information of the construction materials; the design drawings include the specific layout and equipment of the project, the location and size of the components, etc.; the contract conditions specify the technical and quality requirements of the project and the construction period.
3. ** Calculation of quantities **: According to the design drawings and technical specifications, the construction works, decoration works, water supply and drainage works, electrical works and other aspects of the project content shall be measured in detail. The calculation must be accurate and combined with the actual situation of the project to avoid deviation.
4. ** Confirm unit project cost **: After calculating the project quantity, estimate the material price, equipment price, labor cost, etc. The cost must conform to the market price and consider the special circumstances of the project, such as geographical location, construction difficulty, etc., so as to determine the unit project cost.
5. ** Prepare the bill of quantities **.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>