Tiguan main seat cannot be adjusted, no responseIf the main seat of the Tiguan cannot be adjusted and there is no response, it may be due to the following reasons:
1. ** Power seats **
- ** The adjustment switch is damaged **: The switch may not be able to control the motor to adjust the seat due to a short circuit caused by improper use or water.
- ** Seat motor malfunction **: The damaged motor will cause the seat to be unable to adjust. The seat needs to be disassembled and replaced with a new motor.
- ** Circuit Failure **
- The loosening of the main harness of the seat connection would cause all the functions of the seat to fail. In this case, it was necessary to go to a professional repair shop to check the plug harness under the seat, re-connect it, and use the fault detection computer to reset the data.
- The seat adjustment connecting rod may be stuck or stuck due to the oxygen or insufficient grease, which may affect the seat adjustment.
- If the control system does not work or produces noise, it may be that the electromagnetic valve and the body's ground connection affect the operation of the control system; or there is a problem with the circuit breaker on the fuse board; it may also be a switch failure, and the switch voltage needs to be checked. Before testing the relay and the motor, these conditions must be checked first.
- When the seat motor is running but the seat cannot be moved, check whether the rubber joint between the motor and the transmission is worn or damaged.
- A blown fuse in the control unit or a loss of data in the vehicle's comfort module would also cause all functions of the seat to fail.
2. ** Manual seats (if it is a Tiguan model with manual seats)**
- The front and rear could not be adjusted because the seat track was stuck with sundries. The spring at the bottom of the adjustment rod had slipped. The solution was to clean up the track garbage and sundries, disassemble the seat, and re-install the spring at the bottom of the rod.
- The reason why the backrest could not be adjusted was probably because the spring at the bottom of the adjustment switch had slipped, and the adjustment switch was stuck. The adjustment switch could be sprayed with loosening agent to grease it, and the spring at the bottom of the switch could be reinstalled after dismantling the backrest.
- The reason why the seat could not be adjusted up and down was probably because the spring at the bottom of the adjustment switch had slipped. The seat needed to be disassembled and the spring at the bottom needed to be reinstalled.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
Second-hand car, SUV, Volkswagen Tiguan priceThe price of a second-hand Volkswagen Tiguan was affected by factors such as the condition of the car and the age of the car. It was generally around 100,000 yuan per car. For example, the price of the 2016 280TSI automatic two-wheel-drive Silk Road comfort version (2017, 128,000 kilometers, zero transfers) was a certain value, and the price of the 2010 1.8TSI automatic two-wheel-drive fashion version (2011, 160,000 kilometers) was another value.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
What happened to the kettle after the Tiguan was turned off?The reason why the kettle turned off after the Tiguan was turned off could be due to the following reasons:
1. Failure of the thermometer or poor contact, the fan lost its function;
2. The water tank had scale formation, heat dissipation was not good, and the temperature of the water tank was relatively high. Under the effect of speed, the water tank maintained a relatively high temperature during driving. After parking, the temperature rose and the water tank boiled.
3. The car's CPU control failed, and the fan did not work.
4. If there are large sand holes or cracks in the cylinder liner or cylinder cover, when the engine is working, the pressure of compressed air or fuel gas in the cylinder is greater than the pressure of the cooling liquid in the cooling water channel. These gases will be forced into the engine water channel through the sand holes or cracks in the cylinder liner or cylinder cover, forcing the cooling liquid in the engine water channel to spray out (turn over) from the water filling port of the water tank (expansion tank).
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
Who is Atlas in the Myth of Atlas Story?In the Myth of Atlas Story, Atlas is a Titan. He was on the losing side of the war between the Titans and the Olympians. And because of that, he was given the extremely difficult task of holding up the sky, which became his eternal burden.
2 answers
2024-11-20 17:11
After the Tiguan was turned off, the kettle turned back. What happened?There might be several reasons for the kettle to turn back after the Tiguan was turned off:
1. Failure of the thermometer or poor contact will cause the fan to lose its function;
2. The water tank had scale formation, and the heat dissipation was not good, resulting in the high temperature of the water tank. When driving, the water tank maintained a high temperature. After stopping the engine and extinguishing the engine, the temperature continued to rise, and the water tank boiled.
3. The car's CPU control failed, causing the fan to not work.
4. Check if the lid is damaged. When the temperature in the pot is high, if the lid is damaged, the anti-freezing liquid will flow out.
5. If the amount of anti-freezing fluid exceeded the mark on the kettle, it would cause the car to overflow while driving.
6. The malfunction of the thermometer caused the water temperature to be too high. If the water temperature was too high, the cooling liquid could not enter the engine water channel for a large circulation. The small circulation of the anti-freezing liquid in the water tank would cause overflow.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
In 17 years, what was the reason for the Volkswagen Tiguan L kettle to betray the water?There are three reasons for the water tank to reverse after the engine stops: one is the malfunction of the thermometer or the contact is not good, and the fan loses its function; the second is that there is scale formation in the water tank, the heat dissipation is not good, and the temperature of the water tank is relatively high. Under the effect of speed, the water tank is maintained at a high temperature, and after the engine stops, the temperature rises, and the water tank is opened; the third is that the car's computer CPU control fails, and the fan does not work.
<a href="/?from=ask_words" style="color:red" target="_blank">Read more exciting novels for free</a>
Fairy AtlasThe Illustrations of Immortals was a set of pictures created by the Ming Dynasty painter Zhang Lu. It is now in the collection of the Shanghai Museum. There were a total of 18 frames in this album, including 16 portraits and two landscape paintings. The figure painting depicted the gods of fortune, longevity, the eight immortals, and the five elders in folklore. The painting style was vivid and the strokes were elegant and powerful. This album was created in the Ming Dynasty. The author, Zhang Lu, was a painter of the Ming Dynasty. He was good at figure painting and landscape painting. He was known as one of the famous artists of the "Zhejiang School". The Atlas of Immortals showed Taoist thoughts and Chinese folk culture. It was a work with a strong Chinese flavor.
Atlas of EarthAs for the Earth Atlas, there was a new curriculum standard middle school geography study and examination album. In addition to retaining the geographical content of China and the world, its content was arranged according to the content and order of the college entrance examination outline drawn up by the National Examination Center. It included the compulsory module and the elective module of disasters, environmental protection, tourism and other modules that had been repeatedly tested in various provinces and regions in recent years, including the Earth map.(For example, the shape and size of the Earth, the globe and the application of the latitude and longitude network, the direction on the map, the scale, the height, the topographic profile, the application of the contour map, etc.), natural geography (the cosmic environment where the Earth is located, the situation of the Earth in the solar system, the influence of the sun on the Earth, the geographical significance of the Earth's movement, etc.), etc. There was also an "Overall Timlapse" album that showed how humans changed the Earth, such as lithium mining and climate change damage. In addition, there was also a world map from 1418, on which the continents of the world were clearly drawn. It was a Chinese version and was marked as a map provided by all the vassals in the 16th year of Yongle. However, there were disputes about the person who drew this map and how it was drawn. Some people suspected that it was a fake, but the C14 year test results proved that it was old, but the style was different from the nautical chart drawn by Zheng He.
Atlas 20s51520S515 was a collection of national architectural design drawings, mainly related to reinforced concrete and brick drainage inspection wells.
The Atlas covers a variety of inspection well types, such as circular inspection well, rectangular straight inspection well, rectangular three-way inspection well, rectangular four-way inspection well, special-shaped three-way inspection well, rectangular three-way inspection well, rectangular four-way inspection well, special-shaped three-way inspection well, fan-shaped inspection well, vertical groove type drop well, stepped drop well, sinking well, gate groove well, small square inspection well, etc.
In terms of construction, there were many requirements. For example, if the foundation soil is disturbed or over-excavated, corresponding foundation treatment shall be carried out; if the excavation depth of the foundation pit is large, measures shall be taken to ensure the stability and safety of the foundation pit slope; if there is underground water above the design foundation bottom, effective construction drainage measures shall be taken to ensure the dry groove construction; if the foundation of the civil and thousand pipes is located in the well chamber foundation pit, the foundation below the foundation can be filled with graded sand and low-strength concrete; After the excavation of the foundation pit reaches the design elevation, the trench inspection shall be carried out together with the relevant departments.
There were also requirements for the foundation pit refill. The foundation pit refill must be carried out after the construction of the launder and the inspection well cover was completed and reached the design strength. Backfilling shall be carried out simultaneously around the foundation pit. The height difference shall not be greater than 300m. Heavy machinery shall not be used during the process of backfilling. The fill soil's compression factor has different requirements in different scenarios. Generally, it shall not be lower than 0.94. The foundation pit in the frozen depth area shall be backfilled with non-frost heaving materials. If it is located within the scope of the embankment and square, and the required compression factor of the embankment is greater than 0.94, it shall be carried out according to the required compression factor of the embankment. For the foundation pit of the inspection well located in the green space or farmland, the coefficient of embankment can be reduced appropriately but not lower than 0.85.
The inspection well was composed of reinforced concrete cover plate, well wall, cast-in-place reinforced concrete bottom plate and runner. The material of the well wall can be ordinary fired bricks, ordinary concrete bricks, or reinforced concrete on site. Among the materials of the wall, the strength grade of the common bricks was UMU15, the strength grade of the common concrete bricks was UMU20, and the mortar was M10 cement mortar. In terms of concrete materials, the strength grade of the pre-cast cover plate is C30; the strength grade of the reinforced concrete well wall and bottom plate is C30, and the impenetrability grade is P6; the strength grade of the plain concrete well is C25; and the strength grade of the cushion concrete is C15. The steel bars were HPDB300 and HPDB400. As for the runner, the brick-made well chamber runner should be built with the same materials as the well chamber; the concrete well wall well chamber runner should be poured with C15 concrete or built with M10 cement mortar with MU10 special bricks for the runner; the fall well runner and the gate slot should be built with C30 concrete.
This drawing is suitable for the circular drainage pipes without internal pressure outside the industrial and civil buildings in general cities and towns where the water quality conditions meet the urban sewage discharge conditions. If it is used in unfavorable geological sites such as wet and sunken yellow soil, expansive soil, permafrost, liquefied soil, corrosive soil (including corrosive underground water), it shall be treated separately according to relevant specifications and regulations; if it is used in areas with earthquake design intensity of 9 degrees and above, it shall be treated separately according to relevant standards and regulations. In addition, there was also a method to express the inspection well and a drainage inspection well engineering quantity query software website, calc.fycost.com/Engineering/WellS515.aspx (copy to the browser address bar and enter), which could help novices quickly find relevant inspection well data.
The novel "Glittering Four Seasons" is equally exciting. Everyone is welcome to click and read it!
22J403 -1 Atlas22J403 - 1 was a set of drawings about stairs, railings, and railings (I). It could be used in the design and construction of buildings. In terms of architectural design, such as the production and installation of outdoor railings, the style, height, materials, and other related contents of the railings may be determined according to this Atlas. In the design of stairs, the design concept, material selection, installation points, decorative effects, maintenance precautions, and purchase suggestions of the railing board may play a role in specifications and guidance. For example, when designing a modern-style staircase railing, one might refer to the requirements of the modern-style railing in the gallery, such as using black wrought iron to show a concise and dignified temperament, using transparent glass to create a bright and transparent sense of space, or using wood to bring a warm and natural atmosphere, etc. At the same time, they would also consider functional requirements, such as anti-slip design, ergonomically high design, etc.
The novel "Glittering Four Seasons" is equally exciting. Everyone is welcome to click and read it!