block"Block" mainly had the following parts of speech and meanings:
- As a term:
- "Block" can mean "block", for example, in sports events (such as the blocking action in a volleyball game).
- It meant 'block', like a block of stone.
- "She walked four blocks down High Street." (She walked four blocks down the high street.)
- In British English, it could mean "building, building".
- obstacle in the way
- As a verb:
- To prevent someone from doing something.
- It meant to block a road.
- It had the meaning of 'limitation'.
In addition, in the field of computers, a "block" was the smallest unit of storage and processing in a database. It contained the header information of the block itself or PL/QL code. In the field of rap, there was a rap group from Changsha, Hunan Province called "C-Block." They were formed in 2007. The members were Dasha, Liu Cong, and Kung Fu Fatty. They were popular among young people in the local dialect. After joining the music label in 2012, they continuously released special Chinese rap works, such as the album "Explosive Mouth." Their representative works were "Changsha Strategy Changsha."
"Choose" was equally exciting. Everyone was welcome to read it!
Pulley block liftingThe following is related to the lifting of the block and tackle:
** I. Homework preparation **
1. ** Personnel Qualification **
- The personnel engaged in lifting operations (including the lifting of the block and tackle) must be trained and qualified and obtain the special operation qualification certificate. The qualification certificate must be reviewed regularly and cannot be used beyond the time limit.
2. ** Tool Inspection **
- The lifting equipment, including the tackle blocks, slings, lifting tools and accessories used in the lifting operation must be checked and confirmed to be qualified before use.
3. ** Safety technical clarification and work permit application **
- Before the lifting operation, the technical person in charge should make safety technical clarification and apply for relevant work permits. If there were other special operations to be carried out at the same time, the relevant requirements would also be implemented. As the lifting work site was usually complicated, it required coordination from many parties.
4. ** On-site confirmation **
- The operators and guardians must confirm the implementation of safety measures on the spot, formulate clear command signals, and appoint commanders. At the same time, they would clean up the work site, determine the transportation route, and remove obstacles. If a mobile crane is used, the supporting ground must be leveled to prevent the foundation from sinking during the operation.
5. ** Lifting Plan Development **
- For larger lifting operations, a lifting plan must be formulated. For those exceeding a certain scale, the plan must be verified by experts.
6. ** Pre-operation verification **
- Before the operation, the weight, size, lifting route, lifting height, and packaging of the lifting object must be verified. The maximum force must be calculated to determine the location of the lifting point and the binding method. It is forbidden to lift objects that are overloaded or have unknown weight. If there are people below the lifting route or passing through key protection areas, it is forbidden to lift objects without protection.
7. ** Equipment Limit **
- It is strictly forbidden to remove or remove the lifting equipment limit device.
** II. Requirements for the Pulley Block in Double Crane Lifting (if involved)**
1. ** Calculation and planning **
- Two-crane lifting must be calculated and confirmed and a plan must be prepared. The total lifting weight must not exceed 75% of the total lifting capacity of the two cranes under this working condition, and the lifting load of a single crane must not exceed 80% of the permitted load.
2. ** Pulley Block Status **
- During the lifting process, the block and tackle should be kept in a vertical position.
** 3. Pulley Winding (Physics Principles)**
- For the winding of the block, if n is the number of strands of the rope around the moving block, when n is an odd number, the winding starts from the "moving" block; when n is an even number, the winding starts from the "fixed" block.
** IV. Pulley Block in Special Lifting Method **
- In the lifting method of the sliding vertical mast, it was to use the action of the mast crane to lift the block and set up the tail row and other slings to lift the vertical static work piece in place. While watching the Olympics, you can also read the wonderful novels related to the Olympics!