After an hour of negotiating contract prices and details, they finally reached an agreement.
Iron ore: 52.20 USD per ton, one hundred thousand tons per month with a total cost of 5.22 million USD.
Aluminum ore: 80 USD per ton, two hundred thousand tons per month with a total cost of 16 million USD.
The total contract amount was 21.22 billion USD. The shipment would arrive from Port Darwin to Port Ange at the beginning of every month for five years.
Although Ange Island currently has no deepwater port, Jiang Chen had already invested in its construction as two docks would be built by next month. The population base of Ange Island was relatively high and relatively far away from the other eight islands. Therefore, it was ideal to be built into an industrial island with manufacturing as the dominating industry. Hence, a deepwater port was necessary.