The main base was preparing for the second experiment.
The afternoon experiment, just like the last one, aimed to form a spatial shield over the device. Learning from the previous incident of cutting the power directly, both the power supply and detection equipment were arranged inside the device.
These had long been prepared, but the safety of the personnel inside needed attention.
When all the devices were positioned internally, it was certainly necessary for staff to operate them, including the command personnel. There were a total of seven staff members working in the central operating room and other areas.
As the experiment was being prepared, the senior leadership personally met with the seven individuals and discussed safety issues, "You are all among the greatest figures on the frontline of scientific research. For the country, the experiment is very important, but so is the safety of each person, which is even more important than the experiment itself..."