72 I found a Wind Farm

Translator: Nyoi-Bo Studio Editor: Nyoi-Bo Studio

Lately, Chen Jin did not come to the base of operation very often. Nonetheless, in the base of operation, there were significant changes. All the plans that Chen Jin wrote down on paper had become an actual reality. And they were even above target!

For instance, the number of steel plate houses was increased to 150. Capsule factories in the industrial area were up to 105. There were 12 exploration teams, with the furthest exploration distance of one thousand kilometers. Four transport teams were put together, consisting of exploration vehicles, transport vehicles, and trailers. Each team had 100 vehicles of various kinds, and they could search for more than 500 tons of materials and resources at a time. After expanding wind power stations again and again, the power generation rate had reached 2000KW. The number of robots grew to over 2,000.

logologo

This is the end of Part One, and download Webnovel app to continue:

DOWNLOAD NOW
avataravatar
Next chapter